Accessibility Tools
The slab-on-grade placements within the existing building are now complete, along with the majority of the lower-level slab-on-grade placements. The progress of the exterior sheathing and air vapor barrier surrounding the building and windows continues as well. Roofing installation has begun alongside the efforts for the mechanical, electrical, and plumbing work throughout all building floors. Within the existing building, penetrations have been made and lintels have been added for mechanical, electrical, and plumbing conduit. Utility tie-ins progress from Short Street to serve the new building. Click here to see details of Lawrence Oliver for April 2024 Click here to see April 2024 drone footage
The slab-on-grade placements within the existing building are now complete, along with the...
Click Here to watch the live broadcast of the Lawrence Alliance for Education Subcommittee Meeting...
The 8th grade students at the Alexander B. Bruce were recently invited to attend a session at the...
Congratulations to the 59 parent graduates in the ESOL (English for Speakers of Other Languages)...
Lawlor Schools staff enjoyed a breakfast treat from Kiss 108 and Wendy's as winners of the...
Parents of English learners completed 8 months of classes to improve their English.
The Lawrence Alliance for Education (LAE Board) is the state receiver for the LPS
See more videos from Lawrence Public Schools YouTube
Watercolor and Paper
SES Annex
see more Artist of the Week on Lawrence Public School's flickr