Ongoing work includes the exterior brick veneer installation, window and curtainwall installation, terracotta mounting system and insulation, the interior framing and drywall installation, and the installation of MEP systems throughout the building. Painting has begun on the third floor. The repointing of the existing building has been completed and the punch list has now been created. Piping and duct connections have been made to the roof top units and the kitchen hood, freezer, and cooler units have been set in place.