There has been continued excavation of soils to reach the final depth for the building's proposed basement and continued bracing for support of excavation. A base concrete layer has been poured on the East side and additional preparations are being made for the pouring of the slab and foundation walls.
Click here to see details of Lawrence Oliver for February 2023
Click here to see aerial footage of construction site for February 2023