The exterior sheathing of the building is now 95% complete. Rough fire sprinkler installation has been completed on the 3rd floor and has started on the 4th floor. Drywall installation has started within the interior of the building, and repointing of the existing building's masonry has begun. Ongoing activities include window and curtain-wall installation, brick veneer installation, terracotta panel system mounting, interior partition and soffit framing, mechanical and electrical utility installation, and site work with building utility tie-ins.