The team has now formed and poured concrete spread footings at the southern part of the new addition. Steel and metal decking have been delivered onsite and are being erected and installed throughout the site with the help of a crane. This will be an ongoing activity throughout the next couple of months. Construction has now moved its way into the existing building with the installation of floor-leveling material and preparations for window installations.
Click here to see details of Lawrence Oliver for September 2023