Oliver Construction Update February 2023
There has been continued excavation of soils to reach the final depth for the building's proposed basement and continued bracing for support of excavation. A base concrete layer has been poured on the East side and additional preparations are being made for the pouring of the slab and foundation walls.
Click here to see details of Lawrence Oliver for February 2023
Click here to see aerial footage of construction site for February 2023
- Details
- Hits: 808
Oliver Construction Update January 2023
There was continued removal and transportation of excavated soils and continued work to the bracing support for excavation. Subgrade preparation for concrete has started on the East side of the site along with installation of plywood for the concrete pour.
Click here to see details of Lawrence Oliver for January 2023
- Details
- Hits: 917
Oliver Construction Update December 2022
Construction has begun on our new building, and crews have installed dewatering risers at the perimeter of the site. Horizontal bracing for SOE was also installed, with excavation down to the second cut.